Excavation for foundation. |

Foundation being poured. |

Block work |

French drain installed. |

Crawl space insulation. |

Floor joist installation. |

Sub-floor installation. |

Wall studs. |

Roof truss - front peak |

Roof trusses |

Exterior walls started |

Roof work |

Interior view |

Shingles and roof completed. |

Insulation of exterior walls. |

Soffits |

Installation of Anderson Windows
sliding glass door. |

Bracing ceiling to prepare for
exterior wall demolition. |

Demolition of kitchen. |

Removal of exterior walls -
preparing for breakthrough to new construction. |

Break-through complete. View from
existing house to new construction. |

Lew Fowler
measuring for window placement. |

Tim Tines
cutting holes for ceiling lights. |

Nathan Turner
doing electric work. |

Installation of vinyl siding. |

Siding
on back of house completed. |

Siding on side of house
completed. |

Installation of drywall. |

Drywall taped and plastered. |

Applying textured ceiling. |

Primer paint on walls &
ceiling. |

Painting completed!
Start of installation of kitchen cabinets. |

Kitchen cabinets installed.
Lew adding trim. |

Kitchen counter top is delivered
-
all in one piece. |

Kitchen countertop installed. |

Plumbing services completed -
sink, dishwasher and garbage disposal installed. |

Installation of doors
for pantry and powder room. |

Laminate flooring arrives. |

Laminate flooring installed in
kitchen and family room. |
| |
|
|